ETP/STP/WTP:
*Effluent Treatment Plants (ETP):
We Design, Supply, Erection and Commissioning Effluent Treatment Plant (ETP) on Turnkey basis for various types and natures of wastewater’s, effluents which combines advanced physio-chemical treatment processes with tertiary polishing system for the removal of organic, inorganic, oil and grease, heavy metals & suspended solids. Our methodology – We analyze the effluent samples for different effluent parameters as per nature and compositions, carry out the treatability studies by using different methods checking techno-commercial Feasibility and then designed treatment schemes, processes accordingly to suit the purpose and need. Our ETP systems are very compact, tailor made designs, portable required very less foot-print to accommodate, energy efficient. The up-gradation, modification in the existing ETP system is possible to achieve desired limiting standard laid down by the Pollution Control Board (PCB).
* Sewage Treatment Plants (STP):
We Design, Fabricate, Supply, Erection and Commissioning Sewage Treatment Plants (STP) for treating sewage generated by Industry, large colonies, Hotels, Hospitals, IT Parks and commercial buildings. Now a days the Sewage Treatment Plant (STP) became statutory requirement of all the State Pollution Control Boards, everybody, whether Hotelier or Industrialist were looking for economical, easy to install and operate compact type Sewage Treatment Plant. Since the land is extremely expensive, very few industries could afford the large treatment units as recommended by most of the Consultants. We are being pioneer in the field from last 15 years and always in the search of latest and techno commercially viable technology, system by which the need of the society can be easily satisfied.
*Water Treatment Plant (WTP):
Design, Construction, Supply & Installation up to trail run of Water Treatment Plant (WTP), Hospital Wastewater Plant.
* Design, Construction Operation & Maintenance of CETP (Central Effluent Treatment Plant).
Completed ETP/STP/WTP Project Information:
Client Name | Project Information |
---|---|
Zarjis Knit Composite Ltd. | Type of Project: Water Treatment Plant( iron and hardness removal for process water) Capacity: 800 m3/day Project location: 285, Hazaribag, Godnail Narayangonj-1429, Bangladesh |
Combined WTP for RK Fashion Ltd Parity Fashion Ltd. Empire Dyeing Ltd. | Water Treatment Plant( iron and hardness removal for process water) Capacity: 2400 m3/day Project location: 285, Hazaribag, Godnail, Narayangonj-1429, Bangladesh |
Rahamat Knit-Dyeing and Finishing Ltd | Wastewater Treatment Plant Capacity: 800 m3/day Project location: KaliaKhore, Gazipur |
Amman Bangladesh Ltd. | Wastewater Treatment Plant Capacity: 2400 m3/day Baluka, Mymensing, .Bangladesh |
City Sugar | Wastewater Treatment Plant Capacity: 1600 m3/day Project location: Rupganj Narayanganj.Bangladesh |
Barnali Textile & Printings Ltd. | Wastewater Treatment Plant Capacity: 800 m3/day Project location: 285, Hazaribag, Godnail Narayangonj-1429, Bangladesh |
Sigma Group Central Effluent Treatment Plant of Comilla Export processing Zone | Wastewater Treatment Plant Capacity: 15000 m3/day Project location: Commilla Bangladesh |
GMS Knit Composite Ltd. | Modification of existing Wastewater Treatment Plant Capacity: 4000 m3/day Project location: Kashimpur, Gazipur, Bangladesh |
Islam Garments (Knitwear, Textile) Ltd. | Wastewater Treatment Plant Capacity: 2400 m3/day Project location: Konabari, Gazipur, Bangladesh |
FM Yarn Dyeing Ltd. | Wastewater Treatment Plant Capacity: 4000 m3/day Project location: Bhaluka, Bangladesh |
B. Brothers Garments Co. Ltd. | Wastewater Treatment Plant Capacity: 800 m3/day Project location: 290-294, Barpa, Rupsi, Narayanganj.Bangladesh |
Kurmitolla Gulf Club | Construction of Sewerage Treatment Plant (STP) Capacity: 500 m3/day Project location: Kurmitolla, Goluf Club, Dhaka, Cantonment. |
Support